Full-time supervision: when the presence is near-daily
Periodic supervision is attendance tied to structural milestones plus two visits a week during finishing, and it covers what most residential villa projects need. Alongside it we offer a broader level: full-time supervision, with near-daily attendance by a team dedicated to the project for its full duration.
It is usually requested where the programme is tight, the structural detailing unusual, or the owner is out of town and cannot stand over anything himself. It is not priced on the periodic scale, because it is not more visits but a different service: the price is built on team, duration and scope of works, and issued as a specific proposal once the drawings and programme have been reviewed.
The two levels are compared in full in our guide to engineering supervision cost for a villa in Al Khobar.
What Engineering Supervision Covers
- Verifying that execution matches the approved drawings and technical specifications
- Approving materials and samples before delivery and following up on quality testing
- Periodic reports covering progress percentages, technical observations and photographs
- Reviewing the contractor’s payment applications against quantities actually executed
- Managing variation orders, the programme and project handover
Regulatory Reference
Supervision follows the Saudi Building Code (SBC), the requirements of the Eastern Province Municipality and Civil Defence regulations. Reports are issued under an engineer licensed by the Saudi Council of Engineers. The service is available in Al Khobar, Dammam, Dhahran, Qatif, Jubail and Al Ahsa.
Frequently Asked Questions About Project Management and Engineering Supervision
What is the difference between engineering supervision and project management?
Engineering supervision focuses on conformity of execution with the drawings and specifications and on quality of work on site. Project management adds control of the programme, cost, contracts and coordination between parties.
Is supervision legally required for a building permit?
Yes. Municipalities in Saudi Arabia require a licensed engineering office to be responsible for supervising execution in order to complete permit procedures and obtain the completion certificate.
How many site visits are made each month?
The number of visits is set in the contract according to project size and stage, and each visit is documented with a photographic report of progress and observations.