What We Check in a Design Review
- Clashes between the architectural, structural, electrical and mechanical disciplines
- Compliance with the Saudi Building Code and municipal requirements
- Validity of loads and structural sections against the design calculation report
- Compliance of fire and alarm systems with Civil Defence requirements
- Completeness of bills of quantities and construction details before tender
Why Review Before Construction
Correcting an error at the drawing stage costs far less than correcting it after concrete is poured or materials are ordered. An independent design review / third-party check exposes clashes and omissions before the contract is awarded, reducing variation orders and delay.
Frequently Asked Questions About Engineering Design Review
Do you review drawings produced by another office?
Yes — this is the most common case. The review is delivered as an independent report with observations classified by discipline and severity.
What is the final deliverable?
A detailed report setting out each observation, its location in the drawings, the code clause breached and the recommended correction, followed by a second review round after amendment.
Does the review cover the structural calculation report?
Yes. The calculation report, loads and sections are reviewed for compliance with the Saudi Building Code and consistency with the construction drawings.